WG02F05807 GE Range Terminal Block Long Leads

$106.85

Terminal block long leads works with some GE models of stoves / ovens / ranges.

This is a genuine OEM item made by GE

Part Number WG02F05807 replaces  205C1756P002,  223C4296P001,  291245,  293798,  293973,  293976,  299209,  304644,  304645,  318960,  326800,  330691,  340090,  343823,  343824,  4336389,  8004683,  GE-306179,  WB17K10003,  WB17K5017,  WB17M152,  WB17T10001,  WB17T10006,  WB17X10007,  WB17X10015,  WB17X10017,  WB17X10018,  WB17X216,  WB17X217,  WB17X5124,  WB2M2261,  WB2M2262,  WB2M2263